Most fire alarm snags on site come down to a few numbers: how high the call point sits, where the flasher goes, and how far apart the detectors are. This guide puts those numbers into diagrams so you can check a layout at a glance. Each picture shows the BS 5839-1:2025 approach (used on UK and EN 54 projects) next to the NFPA 72 approach (used in the US, and referenced through SBC 801 on many projects in Saudi Arabia).
Use these figures as guidance only. Always check the current edition of the standard, the project specification, the device manufacturer’s data and your local authority (Civil Defense or AHJ) before you fix anything to a wall.
1. Mounting heights on the wall (BS 5839-1:2025)

- Manual call point: 1.4 m from finished floor level to the centre of the device, with a tolerance of 200 mm higher or 300 mm lower (1.1 to 1.6 m). Nobody should travel more than 45 m to reach one, or 30 m in a straight line when the final layout is not yet known. The 2025 edition expects a transparent protective cover on every call point.
- Visual alarm device (flasher): wall-mounted VADs not lower than 2.1 m. Choose a unit whose EN 54-23 rating (for example W-2.4-7.5) matches the height you mount it at.
- Sounder: the standard does not fix a height. Installers usually mount them at 2.1 to 2.5 m so they are not knocked or covered. What matters is sound level: at least 65 dB(A), or 5 dB above background noise lasting more than 30 seconds.
- Control panel: put the display at a comfortable reading height, near the entrance the fire service will use, in a low-risk area.
- Detectors: on the ceiling. The sensing element sits 25 to 600 mm below the ceiling for smoke detectors and 25 to 150 mm for heat detectors, and at least 500 mm from walls.
2. Mounting heights on the wall (NFPA 72)

- Pull station: operable part 1.07 to 1.22 m (42 to 48 in) above floor, within 1.5 m (5 ft) of each exit door, with no more than 61 m (200 ft) travel to the nearest one on the same floor.
- Strobe or horn-strobe: the whole lens between 2.03 and 2.44 m (80 to 96 in) above floor. A combination horn-strobe follows the strobe rule.
- Horn only: top of the device at least 2.29 m (90 in) above floor and at least 150 mm (6 in) below the ceiling.
- Detectors: ceiling mounting is preferred. If a smoke detector has to go on the wall, the top of it sits 100 to 300 mm (4 to 12 in) below the ceiling.
3. Smoke detector spacing on a flat ceiling

The two standards think about coverage differently. BS 5839-1 uses a radius: no point in the room may be more than 7.5 m from a smoke detector. On a square grid that gives 10.6 m between detectors and 5.3 m to the wall, roughly 100 m² per detector. NFPA 72 uses spacing: a nominal 9.1 m (30 ft) between detectors and 4.6 m (15 ft) to the wall, with every point on the ceiling within 0.7 times the spacing (about 6.4 m) of a detector.
In practice, keep detectors away from air-conditioning supply diffusers (BS says at least 1 m), and check beams, light fittings and ceiling height before you finalise the grid. BS 5839-1 gives about 10.5 m as the general limit for point smoke detectors.
4. Heat detector spacing on a flat ceiling

Under BS 5839-1 a heat detector covers a 5.3 m radius, which gives 7.5 m between detectors and 3.8 m to the wall, about 50 m² each. Under NFPA 72, the spacing comes from the detector’s listing, often 15.2 m (50 ft) for common spot types, and must be reduced for ceilings above 3 m. Use heat detectors where smoke detectors would false alarm: kitchens, boiler rooms, car parks and dusty plant areas.
5. Corridors up to 2 m wide

In a narrow corridor the coverage circle only matters along the length, so BS 5839-1 lets you stretch the spacing: smoke detectors up to 15 m apart and 7.5 m from the end wall, heat detectors up to 10.6 m apart and 5.3 m from the end. Under NFPA 72, start from the normal 9.1 m spacing and confirm any wider spacing with the AHJ. Always add a detector where corridors join or turn.
6. Room-by-room scenarios

- Bedrooms and hotel rooms: smoke or multi-sensor detection rather than heat (the 2025 edition prefers this). Sounders must reach 75 dB(A) at the pillow.
- Offices and classrooms: smoke detector grid, a call point at every storey exit, and sounders at 65 dB(A) minimum (BS) or 15 dB above average ambient (NFPA).
- Kitchens: heat detection, with a call point close to the cooking area.
- Noisy plant rooms: sounders louder than the noise, plus flashers. Sounders should not exceed 120 dB(A).
- Accessible toilets: a flasher for people who may be alone or hard of hearing. A lower call point for wheelchair users is recorded as a variation.
7. Warehouses with high roofs and racking

Point detectors struggle once the roof goes above 10 m. Smoke cools and spreads before it reaches the ceiling. Most warehouses use optical beam detectors near the roof instead. Under BS 5839-1, no point may be more than 7.5 m either side of a beam, so beams run about 15 m apart and within 7.5 m of the side walls. On a pitched roof, put a detector within 600 mm of the apex. Tall racking can trap smoke, so add aspirating (ASD) sampling pipes or detectors inside the racks. At loading docks with diesel forklifts, use heat or beam detection rather than point smoke detectors. Keep beams clear of cranes, roller doors and new racking, and check alignment at every service, because steel roofs move with heat.
Quick checklist before you mark up the drawing
- Which standard does the project follow: BS 5839-1, NFPA 72, or a local code that references one of them?
- Have you checked ceiling height, beams and air-conditioning diffusers before setting the detector grid?
- Is there a call point at every storey exit and every final exit?
- Are flashers at the right height for their rating, and sounders loud enough where people sleep?
- Is the panel near the fire service entrance?
To lay out a full system, try the Fire Alarm Design Tool, then work through the full Fire Alarm learning path.