Conduit & Cable Tray Fill Calculator

Last reviewed: by Sarwar Islam

Check how full a conduit or cable tray will be before the cables go in. Choose a metric PVC conduit, an EMT trade size or a tray width and depth, tap in Cat6, Cat6A, fibre, fire alarm and coax cables, and the calculator gives the fill percentage against the NEC 53 / 31 / 40% rule, the IET 35% space factor or the TIA-569 tray guideline, with a to-scale drawing that redraws as you add each cable.

Techubox

Conduit & Cable Tray Fill Calculator

Pick the conduit or tray, tap the cables in, and see the fill % and a to-scale drawing that updates with every cable.

FreeNo sign-upNEC 53 / 31 / 40%TIA-569 tray fillLive drawing
Cables run in
mm ID
Tray inside width × depth
mm W
mm D
Tap to add cables
    ⚙ Advanced options

    The default rules suit most jobs. Rules vary by code: use the one your project specifies.

    %

    🔍 Cross-section, to scale

    Conduit cross-section

      📊 Details: cable areas and notes

      Cables in this run

      🧮 Calculation steps
      📋 Conduit sizes and fill areas

      Inside diameters used by the calculator. Metric: heavy-gauge PVC-U round conduit to BS EN 61386-21, minimum bore from the Marshall-Tufflex data sheet (20, 25, 32 mm) and the published internal area of MK Egatube heavy gauge (16, 38, 50 mm). Light gauge and steel conduit have other bores; check your conduit’s data sheet. EMT: NEC Chapter 9 Table 4.

      🎓 How to use this tool
      1. Tap Conduit or Cable tray.
      2. Pick the conduit size, or tap the tray width and depth (or type them).
      3. Tap the cable buttons to add cables. Use − and + to change the count, edit the diameter to match your cable’s data sheet, or tap ✕ to remove a line.
      4. Read the fill % on the answer card. Green passes, amber is close to the limit (or over the 25% initial tray fill), red is over the limit. The drawing redraws with every change.
      5. Open Advanced options to switch the rule: NEC (default), IET 35% conduit / 45% trunking, TIA-569 for trays, or your own limit.

      Standards & assumptions

      Fill % = total cable cross-section ÷ inside area of the conduit or tray × 100, with each cable taken as a circle of its overall diameter (π d² / 4). Conduit limits: NEC Chapter 9 Table 1, 53% for one cable, 31% for two and 40% for more than two, 60% for a nipple of 600 mm or less (Note 4); a multicore cable, fibre cable or cord counts as one cable and an oval cable is taken on its major diameter (Note 9). The jamming warning follows Table 1 Informational Note 2: with three cables, an inside diameter between 2.8 and 3.2 times the cable diameter can jam. IET guidance (Wiring Matters 88, On-Site Guide Appendix E, Guidance Note 1): where a cable is not in the cable factor tables, the space factor should not exceed 35% for conduit and 45% for trunking; the IET cable factor method takes precedence for the cables it lists and also accounts for run length and bends. Cable tray: TIA-569 asks for an initial calculated fill of no more than 25%, a maximum of 50% and a cable depth of no more than 150 mm, so the TIA rule counts the tray depth up to 150 mm. Tray area = inside width × usable depth. The drawing is a gravity packing of round cables, largest first, for illustration; real cables twist and cross. Cable diameters are typical values from the named data sheets. These documents give guidance; check the current edition and your local authority. The fill check covers drawing-in and space only: it does not derate cables for grouping or check segregation between power and data.

      Sizing the cable first? Use the Cable Size Calculator. · Techubox Engineering Tools · techubox.com/tools

      To download and print this tool without a watermark, please log in and request approval.

      How to check conduit or tray fill with this calculator

      Fill is a pulling and spacing check. A conduit that is too full makes the cables hard to draw in, scuffs the sheaths and leaves no room for the next change; a tray that is too full overheats power cables and buries data cables that someone will need to trace later. The tool turns your cable list into one number you can compare with the rule your project uses.

      1. Tap Conduit or Cable tray.
      2. Choose the conduit size. Metric PVC is listed by its outside diameter with the bore beside it; EMT is listed by its inch trade size. For a tray, tap or type the inside width and the usable depth.
      3. Tap a cable button once for each cable. Change the count with − and +, and type the overall diameter from your cable’s data sheet if it differs from the typical value.
      4. Read the answer card: fill %, the limit that applies, how many more cables fit and, for conduit, the smallest size that passes.
      5. Open Advanced options to switch to the IET or TIA-569 rule, set your own limit, or mark a short nipple between boxes.

      The formula behind the fill percentage

      Each cable is treated as a circle of its overall diameter d, so its area is π × d² / 4. A 6.0 mm Cat6 cable takes 28.27 mm². Add the areas of every cable, then divide by the inside area of the containment: π × ID² / 4 for a conduit, or inside width × usable depth for a tray. Fill % = total cable area ÷ containment area × 100.

      The result is a calculated fill, not a picture of free air. Round cables leave gaps between them, so a conduit at 40% looks well filled and a tray at 50% calculated fill looks full to the top of the side rails. That is why the limits are well below 100%. The drawing in the tool packs the cables to scale, largest first, so you can see how the space is really used.

      Worked example: Cat6 in 25 mm PVC conduit

      Six Cat6 U/UTP cables at 6.0 mm each need 6 × 28.27 = 169.6 mm². A 25 mm heavy-gauge PVC conduit has a minimum bore of about 20.6 mm, so its inside area is π × 20.6² / 4 = 333.3 mm².

      • Fill = 169.6 / 333.3 = 50.9%. More than two cables are allowed 40% under NEC Chapter 9 Table 1, so this fails.
      • Four cables give 113.1 mm², or 33.9%: inside 40%, and just inside the IET 35% space factor, which the tool shows in amber because it is within 10% of the limit.
      • Six cables in 32 mm conduit (bore 26.4 mm, 547.4 mm²) give 31.0%, which passes. The tool offers that size as the smallest that passes.

      Worked example: Cat6A on a 300 × 100 mm tray

      Two hundred Cat6A U/UTP cables at 7.2 mm take 200 × 40.72 = 8,143 mm². The tray offers 300 × 100 = 30,000 mm², so the calculated fill is 27.1%. TIA-569 asks for no more than 25% at the first installation and 50% at most, so the result is amber: 184 cables would meet 25%, and another 168 could be added before the tray reaches 50%. TIA-569 also limits the cable depth to 150 mm, so the TIA rule counts a deeper tray at 150 mm.

      Why two cables are allowed only 31%

      The NEC figures look odd at first: 53% for one cable, 31% for two and 40% for three or more. Two round cables sit side by side across the bore and can wedge at bends, so the limit is lower. The same table warns that three cables can jam when the conduit inside diameter is 2.8 to 3.2 times the cable diameter. Three 7.0 mm cables in a 20.6 mm bore give a ratio of 2.94, and the tool flags it. Under the NEC notes a multicore cable, a fibre cable or a flexible cord counts as one cable, an oval cable is taken on its major diameter, and a nipple of 600 mm or less between boxes may be filled to 60%.

      Example: two 2-core 1.5 mm² fire cables at 7.9 mm in 20 mm conduit (bore 16.3 mm) give 98.0 / 208.7 = 47.0%, far over 31%. One of them alone is 23.5%, inside 53%.

      Conduit and tray dimensions explained

      Metric conduit is named by its outside diameter, but cables only use the bore. A heavy-gauge 20 mm PVC conduit has a bore of about 16.3 mm, so its usable area is a third smaller than the name suggests. Light-gauge and steel conduit have thinner walls and larger bores, so use the data sheet of the conduit you buy. A tray’s usable area is its inside width between the side rails times the depth of cable it can hold, normally the side rail height.

      Conduit and cable tray dimensions used for fillLeft: cross-section of a round conduit with 1 the outside diameter, 2 the wall, and 3 the inside diameter or bore, which sets the usable area. Right: cross-section of a cable tray with 4 the inside width between the side rails, 5 the usable depth up to the top of the side rail, and 6 the base or rungs.123456
      The dimensions the fill check uses. Drawing for illustration, not to scale.
      1. Outside diameter: the size metric conduit is sold by (20, 25, 32 mm). It is not used for fill.
      2. Wall: heavy gauge is thicker than light gauge, so the same outside size has a smaller bore.
      3. Inside diameter (bore): the fill area is π × ID² / 4. Take it from the conduit data sheet, or NEC Chapter 9 Table 4 for EMT.
      4. Inside width: the clear width between the side rails, or one compartment of a divided tray.
      5. Usable depth: up to the top of the side rail. TIA-569 limits the cable depth to 150 mm.
      6. Base or rungs: solid, perforated, wire mesh or ladder. The type changes support and ventilation, not the fill calculation.

      Which rule applies: NEC, IET or TIA-569

      Rules vary by code. NEC Chapter 9 gives the 53 / 31 / 40% limits for conduit and tubing. In the UK and on projects that follow BS 7671, the IET On-Site Guide and Guidance Note 1 size conduit and trunking with cable and conduit factors, which also count the run length and bends; for cables not listed there, such as data and fire alarm cable, the space factor should not exceed 35% for conduit and 45% for trunking. TIA-569 covers telecommunications pathways: 25% initial fill and 50% maximum for cable trays. Local authorities and project specifications can set stricter figures. These documents give guidance; check the current edition and your local authority.

      Common mistakes

      • Using the conduit’s nominal size (20 mm, 1 in) as the inside diameter. The bore is smaller and depends on the wall gauge.
      • Taking cable diameters from memory. Cat6A U/UTP runs from about 6.9 mm to 7.4 mm or more between makers; read the data sheet.
      • Counting the cores of a multicore cable as separate cables.
      • Filling a tray to 50% on day one, leaving no room for moves and additions.
      • Treating a fill pass as a full design check. Grouping derating of power cables, segregation from data cables, bend radius and pulling tension are separate checks.

      Frequently asked questions

      Is 40% the maximum conduit fill?

      Under NEC Chapter 9 Table 1 it is the limit for three or more cables; one cable may fill 53% and two only 31%. The IET space factor for conduit is 35%. Long runs with several bends need more room than either percentage suggests.

      How full can a cable tray be?

      TIA-569 asks for an initial calculated fill of no more than 25% and a maximum of 50%, with cables no more than 150 mm deep. Power cable trays under the NEC follow the separate rules of Article 392, which this tool does not apply.

      Do I count the earth wire?

      Yes. A separate earth or bonding conductor in the conduit takes space and is counted with its real diameter. A multicore cable with the earth inside it counts as one cable.

      How is this different from the Cable Size Calculator?

      The Cable Size Calculator picks the conductor size for the current and voltage drop. This tool takes the finished cables and checks that the conduit or tray can hold them.

      For the rest of a cabling job, see the Structured Cabling Designer, the Fiber Optic Loss Budget Calculator and the Rack Layout & U Planner.

      Scroll to Top